Topkapı 29 in Istanbul, the development this 1+1 residence sits in
← Back to Topkapı 29
1+1 at Topkapı 29 — offer of August 2026Recorded offer exampleOffer of August 2026

1+1 at Topkapı 29 — offer of August 2026

Topkapı, Istanbul

Compare
apartment layout1+1
Size69

About this apartment

A one-bedroom residence of 69 m² at Topkapı 29, offered at $299,000 on 12 August 2026 by Tuba Aydın.

The sender states the residence is ready to move into, and that the terms are 50% on signature with the balance spread over eighteen monthly instalments. The title-deed fee and citizenship eligibility were not stated and are confirmed in writing before you commit to anything.

Every figure here is the sender's, published on the sender's responsibility.

Highlights

  • A 1+1 residence of 69 m² at Topkapı 29, ready to move into
  • 50% on signature, the balance spread over eighteen months
  • The E5 is at the door, and the metro, metrobus, tram and Marmaray are a ten-minute walk
  • Akzirve's Topkapı 29, designed by the London architects Chapman Taylor

What comes with this apartment

this apartment is part of Topkapı 29 in Topkapı, Istanbul. Owners share the whole development and its facilities.

Shopping street and lifestyle centreIndoor and outdoor swimming poolsFitness centre and studioSpaCinema roomLibrary and TV loungeCafé and co-working areaAbout 4,000 m² of social facilities
See the full project & all facilities →

Floor plans & full details

We share detailed apartment, floor and building plans on request.

Request the plans

Reading this offer

this apartment sits inside Topkapı 29. The figures above use terms with precise legal meanings in Türkiye, and each one links to its full definition.

Tools for this Offer

Open a check when you need it. Every result starts with this Offer and keeps the recorded details separate from your scenarios.

Payment plan decoder

Offer price

⁦USD 299,000⁩

1+1 at Topkapı 29 — offer of August 2026 · Topkapı 29

Payment plan

  1. 50% down
  2. 18 monthly instalments

Calculation from the printed terms

  1. Down payment · Simple arithmetic derived from the printed terms$299,000 × 50% = $149,500
  2. Equal monthly amount · Simple arithmetic derived from the printed terms$149,500 ÷ 18approx. $8,300/month

The developer confirms the actual schedule in writing.

Purchase price and official fee references

These approximate figures are meant to give you a picture of the Offer or Project. The contract and documents fix the exact cost.

Approximate fees in lira

approx.⁦TRY 21,000⁩

Includes the fixed TKGM foreign-party addition for one Residence. Excludes the local-coefficient service fee and every conditional row.

Approximate calculation in dollars

approx.⁦$305,000⁩

Includes the price and the buyer's 2% legal Tapu Harcı share. Excludes the seller's share and conditional KDV.

  1. Approximate fees in lira · Calculated resultTKGM revolving-fund service fee: TRY 20,868 = TRY 20,868
  2. Approximate calculation in dollars · Calculated resultUSD 299,000 × (1 + 2%) = USD 304,980
Keep the USD purchase price separate from statutory costs in TRY. This tool does not convert between them.
Official references in detail
FieldPublished rate or amountWhen it appliesWhat to check
Tapu Harcı: seller's legal share2%

Charged separately to the transferor under the cited tariff ruling.

This is not automatically a buyer cost.
Source checked
View source details
Source date
2013
Checked
2026-08-24
Tapu Harcı: buyer's legal share2%

The cited GİB guidance charges the buyer 2% on the declared transfer value, subject to the statutory minimum base.

The estimate includes the buyer's legal share only. Confirm the contract allocation before signing.
Source checked
View source details
Source date
2026
Checked
2026-08-25
KDV on a taxable residence delivery10% / 20% / 150 m²

10% for the first 150 m² and 20% for the excess under the cited decisions.

Confirm first-delivery status, taxable seller, area basis and price inclusion.
Source checked
View source details
Source date
2023-07-07
Checked
2026-08-24
KDV for a qualifying Law 6306 transformation residence1% / 20% / 150 m²

1% for the first 150 m² and 20% for the excess.

Only a qualifying reserve, risk-area or risky-building transaction uses this row.
Source checked
View source details
Source date
2022-03-29 / 2023-07-07
Checked
2026-08-24
Foreign-buyer KDV exemption0%

First delivery to a qualifying non-resident foreign buyer with the required FX evidence.

The three-year disposal restriction and every exemption condition must hold.
Source checked
View source details
Source date
2022-05-01 rule effective date
Checked
2026-08-24
Stamp duty on a taxable written contract9.48‰ / TRY 29,115,961.10 / 2026

Applies only when a money-bearing taxable paper is signed.

It does not attach to every Tapu transfer.
Source checked
View source details
Source date
2025-12-31
Checked
2026-08-24
General notary fee30% / TRY 58.82

For notarial documents when the service is used.

The document type and harç determine the final charge.
Source checked
View source details
Source date
2025-12-30
Checked
2026-08-24
Notary real-estate sale contract fee0.1% / TRY 500 / TRY 4,000

For a sale contract made before a notary instead of the ordinary Tapu route.

Do not add it to a standard transfer automatically.
Source checked
View source details
Source date
2025-12-30
Checked
2026-08-24
Notary translation feeTRY 667.67 / 50% / 10

For a translation done or commissioned by the notary.

The page and line count determine the charge.
Source checked
View source details
Source date
2025-12-30
Checked
2026-08-24
SPK and TDUB licensed appraisal minimumTRY 16,500 / TRY 17,622 / TRY 20,217 / TRY 176 GBM / TRY 125 TDUB

The residence tiers are 1 to 149 m², 150 to 250 m² and 251 to 500 m².

The actual quote may be higher and KDV or other costs may be added.
Source checked
View source details
Source date
2025-12-30
Checked
2026-08-24
TKGM revolving-fund service feeTRY 2,227 × local coefficient / TRY 307 × local coefficient / TRY 20,868

The 2026 tariff uses a local coefficient for the service fee and adds TRY 20,868 when a foreign national is party to the transfer.

The estimate includes only the fixed foreign-party addition for one Residence. Confirm the coefficiented service fee separately.
Source checked
View source details
Source date
2026-01-01
Checked
2026-08-25
DASK compulsory earthquake insurance0.73‰ / 2.82‰ / 1.09‰ / 4.96‰

The tariff depends on risk group, construction type and insured building area.

The insured-value basis updates, so check the policy date.
Source checked
View source details
Source date
2026-08-01 insured-value update
Checked
2026-08-24
Annual Emlak Vergisi for a residence0.2% / 0.1%

Applied to the municipal property-tax value.

The metropolitan classification changes the rate.
Source checked
View source details
Source date
2026
Checked
2026-08-24
Residential electricity subscriptionTRY 263/kW / TRY 140

Deposit depends on contracted kW; connection charges are separate.

The actual contract load decides the deposit.
Source checked
View source details
Source date
2025-12-25
Checked
2026-08-24
Residential natural-gas subscriptionTRY 8,066 + KDV / 200 m²

Connection and deposit depend on area, installed devices and distributor rules.

KDV and document charges may be separate.
Source checked
View source details
Source date
2026 tariff
Checked
2026-08-24
İstanbul water subscription sampleTRY 1,690.50

İSKİ only. Water charges are municipal, not national.

Do not apply this figure outside İstanbul.
Source checked
View source details
Source date
2026
Checked
2026-08-24

Review each fee separately. They do not all apply, and some use different currencies.

Understand a yield calculation with your own numbers

Walk through the arithmetic using only your price, rent and annual-cost assumptions.

Hypothetical calculation using your numbers. This is not a developer Offer.

Prefilled from this Offer's recorded price. Rounded inputs use the approximately convention; the exact figure remains in the record view. Edit it for your scenario.

Rent is never prefilled. Enter your own monthly rent assumption to reveal a hypothetical result.

Enter your own values to see the arithmetic.

This mechanism uses only your assumptions. Add Aidat, void, tax and management to annual costs when they apply. It is not a published or forecast yield.

Your scenario stays in this tool and does not change the recorded Offer.
Check offer dates and availability

Offer from August 2026

Offer state
Recorded as a current Offer example. Confirm today's position in writing.

Needs written confirmation

What is confirmed and what needs confirmation

This compact check uses this Project's record. Offer month, validity and status stay in the date-and-availability check above.

Citizenship indicator

The record answers

No Project badge shown

Confirm in writing

Confirm the named Residence, licensed appraisal, payment evidence and required Tapu restriction.

Delivery state

The record answers

Ready to Move

Confirm in writing

Confirm the contractual delivery position and any timing that affects handover.

Payment terms

The record answers

Payment wording is recorded for this Offer.

Confirm in writing

Obtain the complete dated schedule and every due rule.

Ask us about this Offer